VC-25B Air Force One Replacement

Fixed-price development contract for two VC-25B (modified 747-8) presidential aircraft; original $3.9B 2018 award has grown to over $5B amid schedule slips to 2028.

The VC-25B program replaces the U.S. Air Force's aging VC-25A (747-200) Air Force One fleet with two modified 747-8 aircraft. Awarded to Boeing in 2018 as a fixed-price development contract at .9B, cost overruns have pushed the program's total cost above B, with delivery now expected in 2028.

Award detail

Agency
U.S. Air Force
Award ID
Ceiling value
$3.9B (2018) → >$5B current
Vehicle
Fixed-price development contract
Awarded
2018-07-01
Period of performance ends
2028-06-30

Recipient1

Programs0

No linked records yet.

Frequently asked

What is the VC-25B Air Force One Replacement contract?
The VC-25B program replaces the U.S. Air Force's aging VC-25A (747-200) Air Force One fleet with two modified 747-8 aircraft. Awarded to Boeing in 2018 as a fixed-price development contract at .9B, cost overruns have pushed the program's total cost above B, with delivery now expected in 2028.
Which agency awarded the VC-25B Air Force One Replacement contract?
The VC-25B Air Force One Replacement contract was awarded by U.S. Air Force under a Fixed-price development contract vehicle.
How much is the VC-25B Air Force One Replacement contract worth?
The VC-25B Air Force One Replacement contract has a value of $3.9B (2018) → >$5B current, awarded on 2018-07-01.

Tags

Sources & citations2

Each claim links to its underlying source. Confidence reflects how directly the source supports the claim.

  1. 1

    Boeing remains on track to deliver two new Air Force One jets in 2028, but the program's costs have risen to over $5 billion, exceeding the initial $3.9 billion contract awarded in 2018.

    Defense News: Boeing on track for 2028 Air Force One delivery, costs rise
    Verified2026-07-21
  2. 2

    VC-25B costs have grown amid schedule pressure; Boeing has taken roughly $2.8B in cumulative overrun charges on the fixed-price development contract.

    Aviation Week: Boeing's VC-25B Costs Grow Amid Schedule Pressure
    Verified2026-01-01