Editorial information aggregated from public sources. Not regulated investment advice.

All contracts
ContractVerified

Savannah River Integrated Mission Completion (SRMC)

DOE selected Savannah River Mission Completion, LLC (SRMC) — a joint venture led by a BWX Technologies subsidiary with Fluor and Amentum — for the Savannah River Site Integrated Mission Completion Contract: a single-award IDIQ valued at up to $21B over a 10-year ordering period for liquid-waste and facility closure work.

SRS's liquid-waste program manages roughly 35 million gallons of high-level radioactive waste left over from Cold War plutonium and tritium production, stored in underground tanks; the work under this contract includes vitrifying high-activity waste into glass at the Defense Waste Processing Facility, treating low-activity salt waste at the Salt Waste Processing Facility and Saltstone facility, and emptying, cleaning, and grouting tanks toward operational closure.

Award detail

Agency
U.S. Department of Energy, Office of Environmental Management
Award ID
Ceiling value
Up to $21B
Vehicle
Single-award IDIQ (contract 89303322DEM000068)
Awarded
2021-10-28
Period of performance ends

Recipient1

Programs0

No linked records yet.

Frequently asked

What is the Savannah River Integrated Mission Completion (SRMC) contract?
SRS's liquid-waste program manages roughly 35 million gallons of high-level radioactive waste left over from Cold War plutonium and tritium production, stored in underground tanks; the work under this contract includes vitrifying high-activity waste into glass at the Defense Waste Processing Facility, treating low-activity salt waste at the Salt Waste Processing Facility and Saltstone facility, and emptying, cleaning, and grouting tanks toward operational closure.
Which agency awarded the Savannah River Integrated Mission Completion (SRMC) contract?
The Savannah River Integrated Mission Completion (SRMC) contract was awarded by U.S. Department of Energy, Office of Environmental Management under a Single-award IDIQ (contract 89303322DEM000068) vehicle.
How much is the Savannah River Integrated Mission Completion (SRMC) contract worth?
The Savannah River Integrated Mission Completion (SRMC) contract has a value of Up to $21B, awarded on 2021-10-28.

Tags

Sources & citations2

Each claim links to its underlying source. Confidence reflects how directly the source supports the claim.

  1. 1

    Fluor team awarded an environmental management contract for DOE's Savannah River Site: SRMC joint venture (BWXT-led with Fluor and Amentum), single IDIQ valued at up to $21 billion over a 10-year ordering period

    Fluor Corporation: Fluor Team Awarded Environmental Management Contract for Department of Energy's Savannah River Site
    Verified2021-10-28
  2. 2

    SRS's liquid waste program manages ~35 million gallons of radioactive liquid waste in underground tanks, using the Defense Waste Processing Facility for vitrification and the Salt Waste Processing Facility for salt-waste treatment.

    U.S. Department of Energy: Liquid Waste Management
    Verified2026-08-09