Savannah River Integrated Mission Completion (SRMC)
DOE selected Savannah River Mission Completion, LLC (SRMC) — a joint venture led by a BWX Technologies subsidiary with Fluor and Amentum — for the Savannah River Site Integrated Mission Completion Contract: a single-award IDIQ valued at up to $21B over a 10-year ordering period for liquid-waste and facility closure work.
SRS's liquid-waste program manages roughly 35 million gallons of high-level radioactive waste left over from Cold War plutonium and tritium production, stored in underground tanks; the work under this contract includes vitrifying high-activity waste into glass at the Defense Waste Processing Facility, treating low-activity salt waste at the Salt Waste Processing Facility and Saltstone facility, and emptying, cleaning, and grouting tanks toward operational closure.
Award detail
- Agency
- U.S. Department of Energy, Office of Environmental Management
- Award ID
- Ceiling value
- Up to $21B
- Vehicle
- Single-award IDIQ (contract 89303322DEM000068)
- Awarded
- 2021-10-28
- Period of performance ends
Programs0
No linked records yet.
Frequently asked
- What is the Savannah River Integrated Mission Completion (SRMC) contract?
- SRS's liquid-waste program manages roughly 35 million gallons of high-level radioactive waste left over from Cold War plutonium and tritium production, stored in underground tanks; the work under this contract includes vitrifying high-activity waste into glass at the Defense Waste Processing Facility, treating low-activity salt waste at the Salt Waste Processing Facility and Saltstone facility, and emptying, cleaning, and grouting tanks toward operational closure.
- Which agency awarded the Savannah River Integrated Mission Completion (SRMC) contract?
- The Savannah River Integrated Mission Completion (SRMC) contract was awarded by U.S. Department of Energy, Office of Environmental Management under a Single-award IDIQ (contract 89303322DEM000068) vehicle.
- How much is the Savannah River Integrated Mission Completion (SRMC) contract worth?
- The Savannah River Integrated Mission Completion (SRMC) contract has a value of Up to $21B, awarded on 2021-10-28.
Sources & citations2
Each claim links to its underlying source. Confidence reflects how directly the source supports the claim.
- 1
Fluor team awarded an environmental management contract for DOE's Savannah River Site: SRMC joint venture (BWXT-led with Fluor and Amentum), single IDIQ valued at up to $21 billion over a 10-year ordering period
Fluor Corporation: Fluor Team Awarded Environmental Management Contract for Department of Energy's Savannah River SiteVerified2021-10-28 - 2
SRS's liquid waste program manages ~35 million gallons of radioactive liquid waste in underground tanks, using the Defense Waste Processing Facility for vitrification and the Salt Waste Processing Facility for salt-waste treatment.
U.S. Department of Energy: Liquid Waste ManagementVerified2026-08-09