Ford-Class Carriers CVN-80/CVN-81 Block Contract

Two-carrier block contract to Newport News Shipbuilding for detail design and construction of Ford-class carriers Enterprise (CVN-80) and Doris Miller (CVN-81) — the first multi-ship carrier contract to the yard in over 30 years.

Awarded 2019-01-31, the $15.2B block contract (including $263M for Mk 38 gun system, F-35C, and MQ-25 integration mods) covers detail design and construction of two Gerald R. Ford-class carriers, projected to save the Navy over $4B across the program.

Award detail

Agency
US Navy / NAVSEA
Award ID
Ceiling value
$15.2B
Vehicle
Block/multi-ship contract (detail design & construction)
Awarded
2019-01-31
Period of performance ends

Recipient1

Programs0

No linked records yet.

Frequently asked

What is the Ford-Class Carriers CVN-80/CVN-81 Block Contract contract?
Awarded 2019-01-31, the $15.2B block contract (including $263M for Mk 38 gun system, F-35C, and MQ-25 integration mods) covers detail design and construction of two Gerald R. Ford-class carriers, projected to save the Navy over $4B across the program.
Which agency awarded the Ford-Class Carriers CVN-80/CVN-81 Block Contract contract?
The Ford-Class Carriers CVN-80/CVN-81 Block Contract contract was awarded by US Navy / NAVSEA under a Block/multi-ship contract (detail design & construction) vehicle.
How much is the Ford-Class Carriers CVN-80/CVN-81 Block Contract contract worth?
The Ford-Class Carriers CVN-80/CVN-81 Block Contract contract has a value of $15.2B, awarded on 2019-01-31.